AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Entry  Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG
    Reply  Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts 2020.11.05_Cryring-YR09-baking-layout.pdf
Message ID: 153     Entry time: Thu Nov 11 14:01:00 2021     In reply to: 151
Author: AK, ML 
Subject: Heater channel layouts 

Schematic layout of heaters and channel assignment attached. Table kindly provided by AK. I hope the conversion from excel to pdf didn't swallow any important information.

Attachment 1: 2020.11.05_Cryring-YR09-baking-layout.pdf  658 kB  | Hide | Hide all
2020.11.05_Cryring-YR09-baking-layout.pdf
ELOG V3.1.4-unknown