<p>07:50 Small leaks (near the motors and upper valve) were detected in the tent which were covered with Al foil.</p>
<p>08:10 ML changed the baking temperature to 120 degrees.</p>
<p>09:40 Since the bottom of CARME is cold, due to uneven distribution of heat, baking is stopped.</p>
<p>13:00 Tent was slightly opened from the sides so that the heat can escape.</p>
<p>13:15 NK mounted three 200 W (see red labels in the picture below) and one 40 W (see the yellow label in the picture below) heating jacket on four CF100 flanges. Power cables and thermocouples were taken care of by AK.</p>
<p>14:00 Tent was closed.</p>
<p>14:00-17:00 ML started baking at temperature 80 degrees to check the heat distribution in the tent. Baking was then stopped and will start from Monday.</p>
<p>Attached - thermocouple temperatures (now correct)</p> |