AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Nov 17 07:12:22 2021
Author
*
:
Subject
*
:
<p>CARME baking with heating tape continues</p> <p>Left overnight at -</p> <p>Ch1-3: 140 degrees</p> <p>Ch5-6: 150 degrees</p> <p>Ch8: 100 degrees</p> <p> </p> <p>07:50 - Increased channels 1-3 to 150, channels 5 and 6 to 160, and channel 8 remain at 100. For the gas jet target, channel 2 increased to 150.</p> <p>12:39 - Increased channels 5 and 6 to 170 C. All of CARME is >100 C except "Magnet Pipe" that is at 95 (probably OK given proximity to gate valve). </p> <p>13:40 - Decreased channel 5 to 160 C. Bottom back of CARME was going up, but rest of chamber was not following along. Thermal gradients were getting excessive.</p> <p>15:10 - Checked Kapton wire specs from Allectra. Max temperature of 311-KAPM-060 is 260 C in a vacuum not 160 C as erroneously remembered. Increased Ch 1 2 3 to 160 and channel 5 to 170. Planning on leaving until weekend.</p> <hr /> <p> </p> <p>Progress can be followed on</p> <p>http://web-docs.gsi.de/~lestinsk/baking.php</p> <p>http://web-docs.gsi.de/~lestinsk/vacplot.php</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
IMG_5600.JPG
Original size: 3264x2448
Attachment 2:
IMG_5602.JPG
Original size: 3264x2448
Attachment 3:
20211117_122601.jpg
Original size: 4000x2250
Attachment 4:
20211117_151041.jpg
Original size: 4000x2250
Attachment 5:
20211117_151500.jpg
Original size: 4000x2250
Attachment 6:
Kaptonwires-overview.pdf
Original size: 842x595
Attachment 7:
CARMEtemps.png
Original size: 1000x710
Attachment 8:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown