AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Nov 22 08:06:01 2021
Author
*
:
Subject
*
:
<p>08:20 Temperature of channels 1-3 and 5-6 were reduced to 120 degrees. Immediately after, the conditioning of the NEGs was stopped and D2000s ion pumps were flashed 5 times. The temperature of the gas jet target and the electron target channels was reduced to 120 degrees.</p> <p>11:00 Started activation of D2000 following procedure in ... at T=400 C for trise 30 min + thold 90 minute. After activation, NEG elements are left at 200 C to maintain cleanliness. Temperatures increasing, but still well below safety margins.</p> <p>16:00 Started activation of NEGs from channel 1 at 200 W. No effects on temperatures. Activated channel 2 as well. No significant effects. Increased activation power to 250 W. No issues</p> <p>16:30 Given temperatures are still low decided to activate 3 and 4 with 230 W (Vs. 150 W last time). Ok for 30 minutes then temperature starts increasing a bit too quickly. Decreased to 200 W. Ok.</p> <p>18:45 Activation all NEGs on middle module complete. Left overnight to stabilise / cool.</p> <p>21:00 Channel 6 of the heater stops responding properly. ML asked HKR to disable. No effects on temperatures.</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
IMG_5674.JPG
Original size: 3264x2448
Attachment 2:
CARMEtemps.png
Original size: 1000x710
Attachment 3:
vacplot.png
Original size: 1000x710
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown