AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 162     Entry time: Wed Nov 24 12:08:08 2021
Author: CB + ML OG 
Subject: Ion pumps on 

Found SIP power unit for D2000 #4 not functioning correctly. Max current regardless of ion element connected to.

 

ML kindly loaned a spare. All D2000 work Ok now. Will have to send faulty unit for repairs back to SAES.

 

Opened up front part of tent just enough to allow GSI vacuum division to connect IE 514 and GSI ion pump. Tent to remain until January.

 

Left to do this year:

- Turn on GSI ion pump

- Turn on GSI IE514

- Close top gate valve

- Turn off maglev turbo (very close to magnet)

Attachment 1: vacplot24.png  98 kB  Uploaded Wed Nov 24 13:29:59 2021  | Hide | Hide all
vacplot24.png
Attachment 2: vacplot.png  119 kB  Uploaded Wed Nov 24 13:29:59 2021  | Hide | Hide all
vacplot.png
Attachment 3: CARMEtemps.png  148 kB  Uploaded Wed Nov 24 13:29:59 2021  | Hide | Hide all
CARMEtemps.png
ELOG V3.1.4-unknown