AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:31 2025
Author
*
:
Subject
*
:
<p>All 8 FEEs have been installed in their holders.</p> <p>The damaged feedthrough does not have the D-connector on the adaptor board inserted into the falnge but the FEE is connected to the adaptor board. </p> <p>FEE's were carefully installed, with one person inserting FEE and another making sure FEE was straight and on the correct pin positions. The spring lock on the bottom FEE's have been tightend and zip ties have been placed to make sure they are secured. </p> <p>Rack has been populated with cables from the rack to chamber laid out. Cables mostly go above the rack and hang off the large frame. This frame or the CARME frame takes most of the weight of the cables before they are plugged into the FEEs. </p> <p>Cables are numbered 1-8. Brown ethernet cables are numbered 1-4, green 5,6 and yellow 7,8. Numbers correspnd to Bottom FEE (1,2), Side bottom FEE (3,4), Side top FEE (5,6), Top FEE (7,8)</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown