Entry time:
Thu Sep 24 10:04:58 2020
Author
*
:
Subject
*
:
Following overnight pumping by Leybold turbo pump 09.12 6.26e-8mbar, 2.8e-6mbar (RGA station), leak rate 5e-12 mbar.l/s 09:52 6.08e-8mbar, 2.8e-6mbar (RGA station), leak rate 8e-12 mbar.l/s 10.10 6.02e-8mbar, 2.8e-6mbar (RGA station), leak rate 8.5e-12mbar.l/s KM says leak cart currently isolated CARME chamber + RGA cart - no He has been used around chamber this week so figure represents noise. 10.36 5.94e-8mbar, 2.8e-6mbar (RGA station), leak rate 4.7e-12 mbar.l/s 10.40 KM isolated RGA station (@RGA station) from CARME chamber to replace current RGA (FC sensor) with a more sensitive RGA (with multiplier + FC sensor) CARME vacuum pressure (with no backing) will rise somewhat during this process 11.17 1.35e-7mbar 11.20 New RGA install complete, backing line opened, CARME pressure recovers in < 10s to 5.83e-8mbar 14.08 5.59e-8mbar, 2.7e-6mbar (RGA station), leak cart disconnected (by KM) Cables for neg and neg ion pumps connected with cables trailed out of the octagon through back and front of the octagon. Neg-ion pump connectors are labelled with Kapton tape to prevent confusion with neg connectors. Baking jacket has been partially constructed and will be completed tomorrow.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20200924_152852.jpg
Original size: 4128x3096
Attachment 2:
Photos.zip
Attachment 3:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown