AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:23 2025
Author
*
:
Subject
*
:
<p>Beam OFF. Run started 20/2/22 18:42</p> <p>System checck OK, except white rabbit all fail</p> <p>Temperatures OK</p> <p>Leakage current 3.59 uA.</p> <p>potentiometer = 20.28 mm</p> <p> </p> <p>11:36 OH noticed a channel in aida03 was running hot. Did an asic load check and rate returned to normal.</p> <p> Online monitor also restarted.</p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown