AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 225     Entry time: Tue Feb 22 03:05:06 2022
Author: JM, CB, LV, PM, AK 
Subject: Beam ON, Target ON Run 54  

04:00

Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min

Target ON and open to the ring

YR09xxx ETarget ~1.8e-10

Target E4 inlet pressure 8.4E-9 mbar

Dump S3 ~ 7.0E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

Attachment 1: Screenshot_from_2022-02-22_04-02-25.png  102 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-02-25.png
Attachment 2: Screenshot_from_2022-02-22_04-03-08.png  120 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-03-08.png
Attachment 3: Screenshot_from_2022-02-22_04-03-44.png  21 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-03-44.png
Attachment 4: Screenshot_from_2022-02-22_04-03-24.png  127 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-03-24.png
Attachment 5: Screenshot_from_2022-02-22_04-04-28.png  220 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-04-28.png
Attachment 6: Screenshot_from_2022-02-22_04-04-10.png  155 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-04-10.png
Attachment 7: Screenshot_from_2022-02-22_04-03-55.png  154 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-03-55.png
Attachment 8: Screenshot_from_2022-02-22_04-10-57.png  102 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-10-57.png
Attachment 9: Screenshot_from_2022-02-22_04-10-37.png  103 kB  | Hide | Hide all
Screenshot_from_2022-02-22_04-10-37.png
ELOG V3.1.4-unknown