AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 229     Entry time: Tue Feb 22 06:30:09 2022
Author: RSS, OF 
Subject: Beam ON, Target ON Run 54  

07:30

Beam ON ~8.0E6 pps

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

08:00 The beam is electron cooled by FH and the orbit of the beam is slighty changed.

Attachment 1: temp-2022-02-22_07-36-13.png  112 kB  | Hide | Hide all
temp-2022-02-22_07-36-13.png
Attachment 2: merger-2022-02-22_07-38-15.png  128 kB  | Hide | Hide all
merger-2022-02-22_07-38-15.png
Attachment 3: leakage-2022-02-22_07-38-32.png  21 kB  | Hide | Hide all
leakage-2022-02-22_07-38-32.png
Attachment 4: adc-data-2022-02-22_07-37-51.png  103 kB  | Hide | Hide all
adc-data-2022-02-22_07-37-51.png
Attachment 5: spectrum-2022-02-22_07-36-41.png  176 kB  | Hide | Hide all
spectrum-2022-02-22_07-36-41.png
Attachment 6: ex-energy-2022-02-22_07-39-00.png  156 kB  | Hide | Hide all
ex-energy-2022-02-22_07-39-00.png
Attachment 7: ey-energy-2022-02-22_07-39-20.png  154 kB  | Hide | Hide all
ey-energy-2022-02-22_07-39-20.png
Attachment 8: xy-energy-2022-02-22_07-40-26.png  214 kB  | Hide | Hide all
xy-energy-2022-02-22_07-40-26.png
Attachment 9: correlation-2022-02-22_07-37-00.png  103 kB  | Hide | Hide all
correlation-2022-02-22_07-37-00.png
Attachment 10: good-events-2022-02-22_07-37-21.png  103 kB  | Hide | Hide all
good-events-2022-02-22_07-37-21.png
ELOG V3.1.4-unknown