AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 23     Entry time: Mon Sep 28 13:04:27 2020
Author: JM 
Subject: Baking 

I have (fingers crossed) got the baking stepping up nicely now. I have used some of the outer shell to act as a shield and to direct airflow towards the front and back of the baking volume. I also moved the RE-72 thermocouples to a higher temperature region and replaced the broken thermocouples. The program is on automatic mode and has currently stepped up to 40C with the max diff reduced to ~4C.

I will continue monitoring for a bit but all looks good at the moment. 

Additionally, our baking exploits over the weekend got us down to 9e-9 mbar when I came in this morning.

Attachment 1: 20200928_081831.jpg  1.279 MB  Uploaded Mon Sep 28 14:12:26 2020  | Hide | Hide all
20200928_081831.jpg
Attachment 2: 20200928_130239.jpg  1.968 MB  Uploaded Mon Sep 28 14:13:00 2020  | Hide | Hide all
20200928_130239.jpg
ELOG V3.1.4-unknown