AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 230     Entry time: Tue Feb 22 07:27:28 2022
Author: RSS, OF, ML 
Subject: Beam ON, Target ON Run 54  

08:30

Beam ON ~1.0E7 pps

Target ON and open to the ring

YR09xxx ETarget ~1.9e-10 (saturated)

Target E4 inlet pressure ~8.8E-9 mbar

Dump S3 ~ 6.8E-10 mbar

Nozzle temperature 150 K

Run 54 started, monitoring code restarted.

 

FH and ML are optimising the beam.

Attachment 1: 8-merger-2022-02-22_08-30-27.png  127 kB  | Hide | Hide all
8-merger-2022-02-22_08-30-27.png
Attachment 2: 8-leakage-2022-02-22_08-30-44.png  21 kB  | Hide | Hide all
8-leakage-2022-02-22_08-30-44.png
Attachment 3: 8-adc-data-2022-02-22_08-28-58.png  103 kB  | Hide | Hide all
8-adc-data-2022-02-22_08-28-58.png
Attachment 4: 8-spectrum-2022-02-22_08-28-34.png  176 kB  | Hide | Hide all
8-spectrum-2022-02-22_08-28-34.png
Attachment 5: 8-xy-total-2022-02-22_08-32-04.png  217 kB  | Hide | Hide all
8-xy-total-2022-02-22_08-32-04.png
Attachment 6: 8-ex-energy-2022-02-22_08-31-08.png  157 kB  | Hide | Hide all
8-ex-energy-2022-02-22_08-31-08.png
Attachment 7: 8-ey-energy-2022-02-22_08-31-32.png  155 kB  | Hide | Hide all
8-ey-energy-2022-02-22_08-31-32.png
Attachment 8: 8-correlation-2022-02-22_08-30-00.png  103 kB  | Hide | Hide all
8-correlation-2022-02-22_08-30-00.png
Attachment 9: 8-good-events-2022-02-22_08-29-33.png  103 kB  | Hide | Hide all
8-good-events-2022-02-22_08-29-33.png
Attachment 10: 8-temp-2022-02-22_08-28-09.png  111 kB  | Hide | Hide all
8-temp-2022-02-22_08-28-09.png
ELOG V3.1.4-unknown