AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Feb 22 08:31:25 2022
Author
*
:
Subject
*
:
<p>09:30</p> <p>Beam optimisation. No beam since 09:25.</p> <p>Target ON and open to the ring</p> <p>YR09xxx ETarget ~1.9e-10 (saturated)</p> <p>Target E4 inlet pressure ~8.8E-9 mbar</p> <p>Dump S3 ~ 6.8E-10 mbar</p> <p>Nozzle temperature 150 K</p> <p>Run 54 started, monitoring code restarted.</p> <p> </p> <p>FH and ML are optimising the beam.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
9-ex-2022-02-22_09-29-46.png
Original size: 1920x1014
Attachment 2:
9-ey-2022-02-22_09-30-12.png
Original size: 1920x1014
Attachment 3:
9-xy-2022-02-22_09-31-36.png
Original size: 1920x1014
Attachment 4:
9-adc-2022-02-22_09-28-36.png
Original size: 1920x1080
Attachment 5:
9-temp-2022-02-22_09-26-47.png
Original size: 1920x1080
Attachment 6:
9-merger-2022-02-22_09-28-56.png
Original size: 1920x1080
Attachment 7:
9-leakage-2022-02-22_09-29-14.png
Original size: 1920x1014
Attachment 8:
9-spectrum-2022-02-22_09-27-11.png
Original size: 1920x1080
Attachment 9:
9-correlation-2022-02-22_09-27-37.png
Original size: 1920x1080
Attachment 10:
9-good-events-2022-02-22_09-28-07.png
Original size: 1920x1080
Attachment 11:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown