AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Feb 22 10:30:00 2022
Author
*
:
Subject
*
:
<p>11:30</p> <p>Beam optimisation. No beam since 09:25.</p> <p>Target ON and open to the ring</p> <p>YR09xxx ETarget ~1.9e-10 (saturated)</p> <p>Target E4 inlet pressure ~8.8E-9 mbar</p> <p>Dump S3 ~ 6.8E-10 mbar</p> <p>Nozzle temperature 150 K</p> <p>Run 54 started, monitoring code restarted.</p> <p> </p> <p>Beam optimization will be done until 3 pm and will be then give for the experiment.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
11-ex-2022-02-22_11-30-44.png
Original size: 1920x1014
Attachment 2:
11-ey-2022-02-22_11-30-12.png
Original size: 1920x1014
Attachment 3:
11-xy-2022-02-22_11-31-13.png
Original size: 1920x1014
Attachment 4:
11-adc-2022-02-22_11-27-37.png
Original size: 1920x1080
Attachment 5:
11-good-2022-02-22_11-28-00.png
Original size: 1920x1080
Attachment 6:
11-temp-2022-02-22_11-26-26.png
Original size: 1920x1080
Attachment 7:
11-merger-2022-02-22_11-28-52.png
Original size: 1920x1080
Attachment 8:
11-leakage-2022-02-22_11-29-09.png
Original size: 1920x1014
Attachment 9:
11-spectrum-2022-02-22_11-27-12.png
Original size: 1920x1080
Attachment 10:
11-correlation-2022-02-22_11-28-26.png
Original size: 1920x1080
Attachment 11:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown