<p>11:30</p>
<p>Beam optimisation. No beam since 09:25.</p>
<p>Target ON and open to the ring</p>
<p>YR09xxx ETarget ~1.9e-10 (saturated)</p>
<p>Target E4 inlet pressure ~8.8E-9 mbar</p>
<p>Dump S3 ~ 6.8E-10 mbar</p>
<p>Nozzle temperature 150 K</p>
<p>Run 54 started, monitoring code restarted.</p>
<p> </p>
<p>Beam optimization will be done until 3 pm and will be then give for the experiment.</p> |