<p>Recently the pressure started to raise a bit, we have increased the temperature from 129.1 K to 129.2 K. Current pressure at S1 2.10e-7.</p>
<p><strong>Merger, Tape server (WS3) checks: DONE</strong>, writing ~1 MB/s, refreshing is fine</p>
<p><strong>Leakage current (WS4): 3.46 uA , stable current</strong></p>
<p><strong>DAQ (WS2): temperature checked, clock status:ok</strong><strong>, adc calibration:ok, white rabbit check:ok</strong></p>
<p><strong>DAQ (WS2): everything ok</strong></p>
<p><strong>Online monitoring (WS 5): done</strong></p> |