AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 249     Entry time: Wed Feb 23 03:52:13 2022
Author: Jordan, George 
Subject: Current status 

04:52
Pressure seems to be climbing a little but still stable (just peaked at end of check)
Temps OK
Write Speed: ~1.0Mb/s
System Checks OK
White Rabbit fail diff: 90
Leakage Current: 3.47uA
Cryo Temp: 129.2K (unchanged)

AVG Pressures:
YR07: 1.79e-10mbar
YR08: 2.3e-9mbar
YR09: 9.46e-10mbar
YR10: 1.41e10mbar

Avg pressures plots for last hour and last 6 hours attached.

Attachment 1: 2022-02-23_04-58-19-XYtotal.png  200 kB  | Show | Hide all | Show all
Attachment 2: 2022-02-23_04-57-17-Ex-total-hist.png  166 kB  | Hide | Hide all | Show all
2022-02-23_04-57-17-Ex-total-hist.png
Attachment 3: 2022-02-23_04-56-36-Ex-rate-hist.png  155 kB  | Hide | Hide all | Show all
2022-02-23_04-56-36-Ex-rate-hist.png
Attachment 4: pressures-1hour.jpg  1.555 MB  | Hide | Hide all | Show all
pressures-1hour.jpg
Attachment 5: pressure-6hours.jpg  1.511 MB  | Hide | Hide all | Show all
pressure-6hours.jpg
ELOG V3.1.4-unknown