AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 258     Entry time: Wed Feb 23 18:58:12 2022
Author: TD CN 
Subject: Wednesday 23 February 15.00-23.00 shift 

Assorted screenshots of the CARME, CRYRING and gas jet target control systems in operation

Attachment 1 - detector motion controls

Attachment 2 - gas jet target pressures (blue proxy for target density, red proxy for gas load to CRYRING)

Attachment 3 - Schottky probe monitor of beam

Attachment 4 - CRYRING controls monitor

Attachment 5 - CRYRING vacuum pressures

Attachment 6 - CRYRING beam position and profile monitor 
Attachment 1: 20220223_195402.jpg  2.700 MB  | Hide | Hide all
20220223_195402.jpg
Attachment 2: 20220223_195349.jpg  2.812 MB  | Hide | Hide all
20220223_195349.jpg
Attachment 3: 20220223_195208.jpg  3.226 MB  | Hide | Hide all
20220223_195208.jpg
Attachment 4: 20220223_195203.jpg  3.237 MB  | Hide | Hide all
20220223_195203.jpg
Attachment 5: 20220223_195142.jpg  2.578 MB  | Hide | Hide all
20220223_195142.jpg
Attachment 6: 20220223_195133.jpg  3.577 MB  | Hide | Hide all
20220223_195133.jpg
ELOG V3.1.4-unknown