AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 288     Entry time: Sat Feb 26 22:22:27 2022
Author: David, Pierre-Michell 
Subject: Starting to take data 

At 23:22 we started recording data under the new conditions.

Merger, Tape server (WS3): 1408 kB/s writing ok

Leakage current (WS4): 3.27 uA

DAQ (WS2): temperature checked, clock status:ok, adc calibration:ok, white rabbit check:failed

Online monitoring (WS 5): done

Attachment 1: 2022-02-26_23-33-05xytotal.png  214 kB  | Hide | Hide all
2022-02-26_23-33-05xytotal.png
Attachment 2: 2022-02-26_23-32-38exrate.png  155 kB  | Hide | Hide all
2022-02-26_23-32-38exrate.png
Attachment 3: 2022-02-26_23-32-11extotal.png  163 kB  | Hide | Hide all
2022-02-26_23-32-11extotal.png
Attachment 4: 2022-02-26_23-30-32white.png  128 kB  | Hide | Hide all
2022-02-26_23-30-32white.png
Attachment 5: 2022-02-26_23-30-14correlation.png  102 kB  | Hide | Hide all
2022-02-26_23-30-14correlation.png
Attachment 6: 2022-02-26_23-29-49adc.png  103 kB  | Hide | Hide all
2022-02-26_23-29-49adc.png
Attachment 7: 2022-02-26_23-29-26goodevents.png  103 kB  | Hide | Hide all
2022-02-26_23-29-26goodevents.png
Attachment 8: 2022-02-26_23-28-51temp.png  110 kB  | Hide | Hide all
2022-02-26_23-28-51temp.png
Attachment 9: 2022-02-26_23-26-31current.png  20 kB  | Hide | Hide all
2022-02-26_23-26-31current.png
Attachment 10: 2022-02-26_23-24-38tape.png  120 kB  | Hide | Hide all
2022-02-26_23-24-38tape.png
Attachment 11: 2022-02-26_23-24-13merger.png  128 kB  | Hide | Hide all
2022-02-26_23-24-13merger.png
ELOG V3.1.4-unknown