AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Oct 28 10:41:57 2020
Author
*
:
Subject
*
:
10.32 CARME chamber 5.8e-12mbar (see attachment 1) Backing 1.6e-08mbar (Edwards vacuum cart w/RGA) CARME temps - see attachment 2 All SAES D2000-10 & UHV1400 NEG power OFF All SAES D2000-10 ion pump OFF Gate valve open 11.01 All SAES D2000-10 ion pump ON # V/V presssure/mbar 1 5012/5019 4-8e-11 2 5012 < 8.9e-12 3 5012 < 8.9e-12 4 5012 < 8.9e-12 11.04 CARME chamber 5.7e-12mbar Backing 1.7e-08mbar (Edwards vacuum cart w/RGA) 12.12 CARME chamber 5.3e-12mbar Backing 1.7e-08mbar (Edwards vacuum cart w/RGA) All SAES D2000-10 & UHV1400 NEG power OFF Gate valve open All SAES D2000-10 ion pump ON # V/V presssure/mbar 1 5012 < 8.9e-12 2 5012 < 8.9e-12 3 5012 < 8.9e-12 4 5012 < 8.9e-12 All ion pumps now stabilising wrt V/I/pressure log (pressure) versus time - see attachment 3 16.00 CARME chamber 4.9e-12mbar - see attachment 4 Backing 1.7e-08mbar (Edwards vacuum cart w/RGA) All SAES D2000-10 & UHV1400 NEG power OFF Gate valve open All SAES D2000-10 ion pump ON - see attachment 5 # V/V presssure/mbar 1 5012 < 8.9e-12 2 5012 < 8.9e-12 3 5012 < 8.9e-12 4 5012 < 8.9e-12 All ion pumps now stabilising wrt V/I/pressure CARME temps - see attachment 6 Observing pressure transients from 5e-12mbar to c. 6-7e-12mbar which recover in c. 5-10 minutes 21.00 CARME chamber 4.7e-12mbar
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20201028_103204.jpg
Original size: 4128x3096
Attachment 2:
20201028_103638.jpg
Original size: 4128x3096
Attachment 3:
28102020_pump_down.png
Original size: 640x480
Attachment 4:
20201028_161049.jpg
Original size: 4128x3096
Attachment 5:
20201028_155823.jpg
Original size: 4128x3096
Attachment 6:
20201028_155940.jpg
Original size: 4128x3096
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown