AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 348     Entry time: Tue Mar 1 12:58:32 2022
Author: CB, MS, SS, ML 
Subject: Synced pneumatic motion 

New run R84

Attempting to sync pneumatic movement with ring. Still see something on t out -> p out

Command to move out was being given relative to the wrong time.

Fixed it. Still see one-two events every time we move out around 4-6 MeV. Attempted to greatly increase time before next injection - no difference. Microphonics from moving the detectors? It's just one-two counts on entire detector, acceptable.

 

New run R85

Now moving in/out

Potentiometer: 23.10 mm to 67.19 mm

ELOG V3.1.4-unknown