AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:21 2025
Author
*
:
Subject
*
:
07.51 DAQ continues files 22Feb/R97 ASIC settings 2022Jan31-11-52-00 slow comparator 0x64 EG&G Ortec 448 Pulser OFF All system wide checks OK Attachment 1 - ADC data item stats Attachment 2 - FEE64 temps OK Attachments 3 & 4, 8 & 9 - per FEE64 1.8.W spectra 20us FSR and 200us FSR Attachments 5 & 6 - per FEE64 1.8.L spectra Attachment 7 - per FEE64 stat spectra Leakage current remains 8.36 uA, 100V. Bias power OFF, SIP ion pump power back ON. NIM crate powered off. Motors pi and nnrpi1 still on for remote access. Compressed air off, water off. Fee relay power off and power cable disconnected. Motors box off. Safety pin for motors reinserted. Checked cable harnesses at cryring. 2 good short sections found and left with boxes in cryring. 2 damaged long sections (bad pin and broken ceramic) taken to repair in Edinburgh.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown