Attachments 1-5 - CARME shipment in CRYRING hall XHV chambers nearest to YR09 Will remove top and sides of XHV chamber crate and install 4x SAES D-2000, 1x Leybold Mag Lev 400 turbo and 1x Leybold Ionvac IE514 gauge for basic vacuum test. Attachments 6-7 - spare wire seals shipped from Edinburgh to GSI poor packing and/or re-packing has resulted in bending of wire seals wire seals shipped from STFC DL to GSI appear to be OK - see attachment 1
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20210809_132802.jpg
Original size: 4128x1956
Attachment 2:
20210809_132813.jpg
Original size: 4128x1956
Attachment 3:
20210809_132903.jpg
Original size: 4128x1956
Attachment 4:
20210809_132913.jpg
Original size: 4128x1956
Attachment 5:
20210809_133438.jpg
Original size: 4128x1956
Attachment 6:
20210809_145826.jpg
Original size: 4128x1956
Attachment 7:
20210809_145831.jpg
Original size: 4128x1956
Attachment 8:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown