AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue May 2 15:02:09 2023
Author
*
:
Subject
*
:
<p>Completed mounting harnesses and detectors.</p> <p>The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh.</p> <p>The strain relief on the detectors' side are still being manufactured.</p> <p> </p> <p>We plan to test the detectors electrically from next week without moving the dolly. DR and OG to find a temporary mounting point for the manifold so that FEEs can be cooled in current configuration.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20230502_153410.jpg
Original size: 4000x2250
Attachment 2:
20230502_153503.jpg
Original size: 4000x2250
Attachment 3:
20230502_153509.jpg
Original size: 4000x2250
Attachment 4:
20230502_153511.jpg
Original size: 4000x2250
Attachment 5:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown