AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed May 24 08:35:12 2023
Author
*
:
Subject
*
:
<p>The new MACOR strain reliefs on the (detector side) have been installed. See attached photos</p> <p>The two pieces of MACOR are not fully closed but we are confident that the kapton wires are sufficiently clamped.</p> <p>In order for the strain reliefs to be installed in the correct poisition, two nuts on the jacking plate of the cable harness had to be removed. This is as the groove in the strain relief was not deep enough to accomadate the nut. </p> <p>Attached is also a video of the wires (not) moving with the strain reliefs mounted</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20230524_092010.jpg
Original size: 4000x3000
Attachment 2:
20230524_092017.jpg
Original size: 4000x3000
Attachment 3:
20230524_092101.jpg
Original size: 4000x3000
Attachment 4:
20230524_093000.jpg
Original size: 4000x3000
Attachment 5:
20230524_092159.mp4
Attachment 6:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown