AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:28 2025
Author
*
:
Subject
*
:
<p>Strain reliefs on the flange side of the cable harness have been installed for two detectors (top right and bottom right detectors). </p> <p>We require the strain relief parts from edinburgh in order to install strain reliefs for the left two detectors. </p> <p>Find attached images for the strain relief installed and a video of the clamped cables during a movement cycle.</p> <p>A V-I test was performed for the two detectors which have all strain reliefs installed (see attachment 4). V-I curve appears similar to the previous test (elog 398). Aluminium foil shield is now a bit battered so may have some small light leaks. Detectors were moved using the motors while bias was applied at 150V. Small change in leakage current observed (~0.01-0.02 uA)</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown