<p>Strain reliefs on the flange side of the cable harness have been installed for two detectors (top right and bottom right detectors). </p>
<p>We require the strain relief parts from edinburgh in order to install strain reliefs for the left two detectors. </p>
<p>Find attached images for the strain relief installed and a video of the clamped cables during a movement cycle.</p>
<p>A V-I test was performed for the two detectors which have all strain reliefs installed (see attachment 4). V-I curve appears similar to the previous test (elog 398). Aluminium foil shield is now a bit battered so may have some small light leaks. Detectors were moved using the motors while bias was applied at 150V. Small change in leakage current observed (~0.01-0.02 uA)</p> |