AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jun 22 18:58:02 2023
Author
*
:
Subject
*
:
<p>The wire seal has been tightend further to 160 Nm. Open neg feed-through flange has also been fully tightend. </p> <p>The CARME chamber was then slid back onto the aluminium frame on the ring. Two carriages were damaged during the sliding process, which have now been replaced. Carriages were replaced by lifting one end of the upper frame section using the crane by only ~1mm. This was sufficient to slide out the broken carriage and replace it (see images to be uploaded).. It appears there is some deformation in the rails on the temporary frame as CARME is slid across, which resulted in the damaged carriages -> further refinements are required for future slidings. The height of the chamber has been checked using the laser allignment. </p> <p>The turbo pump has also been mounted to the top of the chamber . Current plan is to close to the interaction chamber tomorrow and begin pumping. </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20230622_112534.jpg
Original size: 4000x3000
Attachment 2:
20230622_112827.jpg
Original size: 4000x3000
Attachment 3:
20230622_120307.jpg
Original size: 4000x3000
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown