AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Jul 20 08:29:26 2023
Author
*
:
Subject
*
:
09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar 12.10 Bakeout tent frame installed SAES UHV1400 NEG pump power cables #1-6 installed See attachments 1 & 2 16.35 Attachments 3-6 upstream baseplate 3x sets of heaters beneath CARME chamber connected to CRYRING heater/TC manifold - attachments 7-8 16.45 Pirani 1.00e-3 mbar IE514 4.80e-8 mbar 17.10 SAES D-2000 #1 downstream, outside NEG power + HV ( attachment 9 - OK cable connector ) SAES D-2000 #3 downstream, inside NEG power + HV SAES D-2000 #4 upstream, inside HV SAES D-2000 #2 upstream, outside HV 2x ( of 4x ) SAES D-2000 neg power cables were broken - forward-shell detached (unscrewed ) from back-shell remaining attached to D-2000 neg power connector. Re-assembly is straightforward but it is unclear how the 6x female sockets are aligned with the connector keys of the forward-shell (attachments 10-11 cf. attachment 9). Until this is understood these 2x SAES D-2000 neg power cables should not be used.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20230720_120957.jpg
Original size: 4000x1800
Attachment 2:
20230720_121016.jpg
Original size: 4000x1800
Attachment 3:
20230720_162938.jpg
Original size: 4000x1800
Attachment 4:
20230720_163700.jpg
Original size: 4000x1800
Attachment 5:
20230720_163651.jpg
Original size: 4000x1800
Attachment 6:
20230720_163655.jpg
Original size: 4000x1800
Attachment 7:
20230721_093447.jpg
Original size: 4000x1800
Attachment 8:
20230721_093452.jpg
Original size: 4000x1800
Attachment 9:
20230721_092923.jpg
Original size: 4000x1800
Attachment 10:
20230721_094608.jpg
Original size: 4000x1800
Attachment 11:
20230721_094642.jpg
Original size: 4000x1800
Attachment 12:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown