AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Aug 12 11:57:51 2023
Author
*
:
Subject
*
:
<p>Heater channel layouts for the interaction chamber and carme in attached documents. </p> <p>Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)</p> <ul> <li>1-1 Internal TC 1</li> <li>1-2 Internal TC 2</li> <li>1-3 Internal TC 3</li> <li>1-4 CARME - top of the front section</li> <li>1-5 CARME - bottom of the front section</li> <li>1-6 CARME - top of the mid section</li> <li>1-7 CARME - middle of the mid section</li> <li>1-8 CARME - bottom of the mid section</li> <li>2-1 Float - bottom of mid section </li> <li>2-2 CARME - middle of rear section </li> <li>2-3 Float - middle of the front section</li> <li>2-4 CARME - bottom VAT valve</li> <li>2-5 Float - middle of the rear section </li> <li>2-6 CARME - Top elbow</li> <li>2-7 Float - top of the mid section</li> <li>2-8 CARME - rear beam pipe</li> </ul> <p>Thermocouple posiitons have been updated in the monitoring code, including the averages for the CARME chamber. </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Cryring-YR09-CARME-Layout.pdf
Original size: 792x612
Attachment 2:
Cryring-YR09-CARME-Layout2.pdf
Original size: 612x792
Attachment 3:
Cryring-YR09-CARME-Layout3.pdf
Original size: 612x792
Attachment 4:
Cryring-YR09-eTarget-Layout1.pdf
Original size: 1932x1493
Attachment 5:
Cryring-YR09-eTarget-Layout2.pdf
Original size: 612x792
Attachment 6:
Cryring-YR09-eTarget-Layout3.pdf
Original size: 612x792
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown