<p>Heater channel layouts for the interaction chamber and carme in attached documents. </p>
<p>Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)</p>
<ul>
<li>1-1 Internal TC 1</li>
<li>1-2 Internal TC 2</li>
<li>1-3 Internal TC 3</li>
<li>1-4 CARME - top of the front section</li>
<li>1-5 CARME - bottom of the front section</li>
<li>1-6 CARME - top of the mid section</li>
<li>1-7 CARME - middle of the mid section</li>
<li>1-8 CARME - bottom of the mid section</li>
<li>2-1 Float - bottom of mid section </li>
<li>2-2 CARME - middle of rear section </li>
<li>2-3 Float - middle of the front section</li>
<li>2-4 CARME - bottom VAT valve</li>
<li>2-5 Float - middle of the rear section </li>
<li>2-6 CARME - Top elbow</li>
<li>2-7 Float - top of the mid section</li>
<li>2-8 CARME - rear beam pipe</li>
</ul>
<p>Thermocouple posiitons have been updated in the monitoring code, including the averages for the CARME chamber. </p> |