AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 444     Entry time: Tue Sep 26 08:08:42 2023
Author: TD 
Subject: Tuesday 26 September 
09.07 IE514 pressure 6.4e-11 mbar, ambient temperature +20.3 deg C

      Using appc218 ( account carme ) workstation by the CARME 19" rack 
     
      ssh pi@carmebakingpi

      Re-connect to bakeout monitor app 

      screen -dR

      See attcahment 1


12.02 Vacuum group ion pump disconnected and RGA removed from CARME chamber -  outside of CARME bakeout tent 'closed' - see attachments 2-4

      Vacuum group IE514 to be disconnected


14.45 Vacuum group disconnect their IE514

      Inside of CARME bakeout tent closed

      Photos of the CARME bakeout tent inside and outside CRYRING - see attachments 5-7  
Attachment 1: 1000007087.jpg  1.250 MB  Uploaded Tue Sep 26 09:14:19 2023  | Hide | Hide all
1000007087.jpg
Attachment 2: 1000007090.jpg  2.639 MB  Uploaded Tue Sep 26 12:01:52 2023  | Hide | Hide all
1000007090.jpg
Attachment 3: 1000007091.jpg  2.585 MB  Uploaded Tue Sep 26 12:01:52 2023  | Hide | Hide all
1000007091.jpg
Attachment 4: 1000007089.jpg  2.262 MB  Uploaded Tue Sep 26 12:01:52 2023  | Hide | Hide all
1000007089.jpg
Attachment 5: 1000007096.jpg  2.757 MB  Uploaded Tue Sep 26 14:48:41 2023  | Hide | Hide all
1000007096.jpg
Attachment 6: 1000007095.jpg  2.341 MB  Uploaded Tue Sep 26 14:48:41 2023  | Hide | Hide all
1000007095.jpg
Attachment 7: 1000007094.jpg  2.790 MB  Uploaded Tue Sep 26 14:48:41 2023  | Hide | Hide all
1000007094.jpg
ELOG V3.1.4-unknown