AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Sep 27 15:56:41 2023
Author
*
:
Subject
*
:
16.55 CARME IE514 8.2e-11 mbar Vacuum pressure increased slowly overnight from c. 6e-11 mbar yesterday to c. 8e-11 mbar today following low power startup tests of the bakeout controller heating the CARME interaction and detector chambers yesterday and today. Attachment 1 - bakeout controller config courtesy Anton Kalinin Attachments 2 & 3 - bakeout controller summary displays and CARME bakeout monitor display c. 17.00 today The 3x CARME heaters are connected to controller #4 zones # 1-3, i.e. lower right display, zones 1-3, mains fuses F9-F11 17.30 3x ( of 4x ) SAES D-2000 ion pump controllers ( SIP modules ) switched off. Fourth controller was already switched off and SHV cable disconnected from rear panel of SIP module.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
1000007129.jpg
Original size: 4000x1800
Attachment 2:
1000007127.jpg
Original size: 4000x1800
Attachment 3:
1000007128.jpg
Original size: 4000x1800
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown