AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 447     Entry time: Thu Sep 28 09:19:50 2023
Author: TD 
Subject: Thursday 28 September 
10.20 CARME IE514 8.6e-11 mbar

      CARME bakeout monitor and ELOTECH bakeout controller status - see attachments 1 & 2

      The CARME bakeout monitor shows recovery from test yesterday evening. The ELOTECH controller was switched to manual mode for the 3x CARME zones and 5% power selected 
for 45 minutes. CARME TCs increased from mid-20s to high 20s/low 30s over a period of 45 minutes. At the conclusion of the test power was set to 0% for all 3x CARME zones 
and the mode changed from manual to controlled.
Attachment 1: 1000007142.jpg  2.084 MB  Uploaded Thu Sep 28 10:25:54 2023  | Hide | Hide all
1000007142.jpg
Attachment 2: 1000007143.jpg  2.298 MB  Uploaded Thu Sep 28 10:25:54 2023  | Hide | Hide all
1000007143.jpg
ELOG V3.1.4-unknown