AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:24 2025
Author
*
:
Subject
*
:
<p>Found two leaks in the welding of the manifolds, marked them in tape. Manifold to be repaired on Monday. Remember to re-install missing hoses, which are in a bucket in the cave.</p> <p>See attached how it is supposed to look like.</p> <p>Left hand hose (inlet) was too short and was cut to dismount the manifold. Davide will obtain a new tube of the same type and mount it for us. NOTE THAT THE INLET connector (BLUE manifold) was leaking. Unclear if this was the hose or poor plumbing.</p> <p>Installed cable management system that was never used during the last beamtime. Started to thread cables through it. There should be sufficient space to re-install the manifolds with the cable tray in place. If this is difficult, the tray is installed with zip ties only so altering position should be relativly straightforward. The mounting points of the outlet manifold on the CARME chamber can also be rotated around to give a bit more space.</p> <p>Cleaned up some boxes and moved heaters and some empty boxes to the CRYRING roof.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown