AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:17 2025
Author
*
:
Subject
*
:
Cooling water manifolds The manifolds were returned this afternoon. Inflow manifold - blue hose, female Swagelok connectors Attached to inflow hose and bled using bleed/drain valve. Small leak observed at the 3/8" connection between the manifold and the bleed/drain valve - attachment tightened and leak fixed. Inflow manifold installed. Outflow manifold - red hose, male Swagelok connectors Attached to outflow hose and bled using bleed/drain valve. Small leak observed at the weld immediately *below* the weld that had been re-worked - this weld had not been re-worked. Significant leak observed at one of the male Swagelok connectors in the lower half of the manifold - it does not seal correctly. DR will return this manifold to the workshop for welding re-work Tuesday am. The faulty male Swagelok will be replaced. AIDA cabling 16x AIDA PSU, HDMI and RJ45 Cat 6 cables and 4x SHV-BNC cables required. Available 8x AIDA PSU cables 1x AIDA PSU cable ( in one of two white plastic storage boxs with 7x FEE64s returned from STFC DL ) now appears to be missing 16x AIDA HDMI cables 8x RJ45 Cat 6 network cables 1x RJ45 Cat 6 network cable ( network switch to CRYRING network patch panel - to be replaced ) 3x RJ45 Cat 6 network cables found in AIDA plastic box ( S4 Messehutte ) 3x SHV-BNC Will check DESPEC store above ESR with NH tomorrow afternoon.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown