AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:13:44 2025
Author
*
:
Subject
*
:
> > Cooling water manifolds > > > The manifolds were returned this afternoon. > > Inflow manifold - blue hose, female Swagelok connectors > > Attached to inflow hose and bled using bleed/drain valve. > Small leak observed at the 3/8" connection between the manifold and the bleed/drain valve - attachment tightened and leak fixed. > Inflow manifold installed. > > Outflow manifold - red hose, male Swagelok connectors > > Attached to outflow hose and bled using bleed/drain valve. > Small leak observed at the weld immediately *below* the weld that had been re-worked - this weld had not been re-worked. > Significant leak observed at one of the male Swagelok connectors in the lower half of the manifold - it does not seal correctly. > > > DR will return this manifold to the workshop for welding re-work Tuesday am. > The faulty male Swagelok will be replaced. > > > AIDA cabling > > > 16x AIDA PSU, HDMI and RJ45 Cat 6 cables and 4x SHV-BNC cables required. > > Available > > 8x AIDA PSU cables > 1x AIDA PSU cable ( in one of two white plastic storage boxs with 7x FEE64s returned from STFC DL ) now appears to be missing > > 16x AIDA HDMI cables > > 8x RJ45 Cat 6 network cables > 1x RJ45 Cat 6 network cable ( network switch to CRYRING network patch panel - to be replaced ) > 3x RJ45 Cat 6 network cables found in AIDA plastic box ( S4 Messehutte ) > > 3x SHV-BNC > > Will check DESPEC store above ESR with NH tomorrow afternoon.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown