AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Nov 15 22:27:14 2025
Author
*
:
Subject
*
:
> Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot > due to alignment conflict. Three bolts were mounted per foot instead. > > One of the mounting holes in CARME has been damaged and the thread has been ruined. Simple rethreading attempts > failed. Three good holes left - not an issue for now. > > One of the shims between the feet and the chamber had to be modified in the workshop. Some feet were rather > difficult to mount, but in the end we succedeed. > > CARME was then lifted on the Al frame and gently dropped. The crane remains in place overnight to prevent it > falling over given it is not anchored to the floor. > > Front foot and back foot were also mounted. > > Elbows at the back were mounted. > > Currently considering whether to mount gate valves before or after lifting in place on YR09. Lift experts will > decide tomorrow what is the easiest procedure given constraints on the ring. > > See other attachment and next entry for current status. > > > YR09 downstream will be cleared tomorrow morning. Lift will proceed tomorrow afternoon.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898