AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 495     Entry time: Tue Feb 6 09:39:54 2024
Author: CB 
Subject: Detector bias tests 

10:30 Found ADC#4 on aida 1 and 4 are suddenly noisy. See attach 1-2. Checkloaded multiple times - no effect.

Leakage current overnight was stable, but a clear transient can be observed yesterday around the times of the DSSD motion test. We did not observe this in the cave looking at the CAEN module - it might have been too fast.

Now reducing bias to 50 V and will check differences later. FEE temperatures OK.

 

10:50 Started DAQ. Rates are much higher in n+n strips, but p+n strips appear unaffected. See attach 4-5.

Stopped DAQ. Will leave 50V until after lunch.

 

11:27 Checked motor control status after yesterday's setup (see previous ELOG entry). See attach 6.

IN counters are respectively: read, increases, latch (left), latch (right)

Read is the number of pulses sent with the instruction to move. Increases is the number of times the instruction was considered. Latch on/off indicates the 1 s time interval during which commands sent to a motor arm (left or right) are considered double-firing or mistake, and ignored.

The number of increases is the same for move in/out - good!

The number of increases for move out is 1 unit less than move in - one double pulse / double command must have been received overnight and ignored.

Note torque on right arm is 2 (arbitrary units) which is unusually high and may indicate some tension in the kapton wires. No apparent effect on DSSD2,4 on that arm. Will not move for now.

 

13:24 FEE temperatures OK, leakage currents decreasing slighly.

13:41 Slowly increased bias to 100V. Interestingly it is now DSSD#4 (Ch#3) that displays the highest leakage current. Attach 7

13:45 Stats & Rates look rather similar to earlier this morning at 150V, but aida01 and 04 are quieter. Attach 8-9. Will leave at 100V for a while longer before moving to 150V.

 

15:20 Set bias to 150V

15:50 Nikos testing target. Started short run. Stats & Rates attached (10-11). Same as yesterday, aida01 and 04 ADC#4 no longer noisy.

V-I on attach 12-13. Legends unreliable!

 

17:00 Nikos completed target test. YR09 pressure around 3E-10 mbar with around 5E11 atoms/cm2 He target. Target not quite stable (10-20%), some optimisation required, but pressure holds at 3E-10 mbar for several minutes.

Beam on target will increase ring pressure. Can't test for now. Target tests without beam complete. Need to log all the data remotely. No logging available at present.

Leaving bias at 150V overnight. No run.

 

 

Attachment 1: Screenshot_from_2024-02-06_10-39-06.png  170 kB  | Hide | Hide all
Screenshot_from_2024-02-06_10-39-06.png
Attachment 2: Screenshot_from_2024-02-06_10-39-15.png  109 kB  | Hide | Hide all
Screenshot_from_2024-02-06_10-39-15.png
Attachment 3: Screenshot_from_2024-02-06_10-39-27.png  19 kB  | Hide | Hide all
Screenshot_from_2024-02-06_10-39-27.png
Attachment 4: Screenshot_from_2024-02-06_10-51-42.png  177 kB  | Hide | Hide all
Screenshot_from_2024-02-06_10-51-42.png
Attachment 5: Screenshot_from_2024-02-06_10-51-50.png  113 kB  | Hide | Hide all
Screenshot_from_2024-02-06_10-51-50.png
Attachment 6: Screenshot_from_2024-02-06_11-26-53.png  122 kB  | Hide | Hide all
Screenshot_from_2024-02-06_11-26-53.png
Attachment 7: Screenshot_from_2024-02-06_13-41-40.png  39 kB  Uploaded Tue Feb 6 12:42:42 2024  | Hide | Hide all
Screenshot_from_2024-02-06_13-41-40.png
Attachment 8: Screenshot_from_2024-02-06_13-44-26.png  166 kB  Uploaded Tue Feb 6 12:46:10 2024  | Hide | Hide all
Screenshot_from_2024-02-06_13-44-26.png
Attachment 9: Screenshot_from_2024-02-06_13-44-38.png  105 kB  Uploaded Tue Feb 6 12:46:10 2024  | Hide | Hide all
Screenshot_from_2024-02-06_13-44-38.png
Attachment 10: Screenshot_from_2024-02-06_15-49-10.png  166 kB  Uploaded Tue Feb 6 14:50:32 2024  | Hide | Hide all
Screenshot_from_2024-02-06_15-49-10.png
Attachment 11: Screenshot_from_2024-02-06_15-49-16.png  105 kB  Uploaded Tue Feb 6 14:50:32 2024  | Hide | Hide all
Screenshot_from_2024-02-06_15-49-16.png
Attachment 12: Screenshot_from_2024-02-06_15-53-22.png  20 kB  Uploaded Tue Feb 6 14:54:04 2024  | Hide | Hide all
Screenshot_from_2024-02-06_15-53-22.png
Attachment 13: Screenshot_from_2024-02-06_15-54-40.png  39 kB  Uploaded Tue Feb 6 14:54:50 2024  | Hide | Hide all
Screenshot_from_2024-02-06_15-54-40.png
ELOG V3.1.4-unknown