AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 5     Entry time: Wed Sep 2 17:01:49 2020
Author: JM 
Subject: Bakeout started and valve installation 

Initial bakeout started which will run until friday, temperature had reached 44 degrees when I left the lab. 

The bottom valve has now been installed on the main chamber

Attachment 1: Photos.zip  6.083 MB  Uploaded Wed Sep 2 18:10:31 2020
ELOG V3.1.4-unknown