AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 22:16:14 2025
Author
*
:
Subject
*
:
<p>Run 27 Started to check optimsation of the beam - target overlap.</p> <p>Beam intensity at injection is roughly 1e7 particles</p> <p>Target density apporx 4.2e11 atoms/cm2 and stable.</p> <p>Ring pressure is below 1e-10 mbar for all ring sections and stable</p> <p>First optimisation procedure was to vary the horizontal beam position and see the effect on the count rate in detector #0 (top left) (see elog 509). Beam position was scanned from -9 and -4. Attachment 1 shows the maximum in count rate around the -7.5 position. </p> <p>Second optimisation procedure was to change the time ions are allowed to circulate in the ring before being dumped. The count rate over 5 minutes in detector #0 (top left) at ~20 MeV was used as a gauge. This is the only part of the cycle we can control.</p> <p>Time (s) Counts</p> <p>2 148</p> <p>3 200</p> <p>4 178</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown