AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Feb 15 10:39:50 2024
Author
*
:
Subject
*
:
<p>11:27</p> <p>Run 29 started. Beam energy is 1.3435 MeV/u with a cooler voltage of 751.3 V.</p> <p>We observe significantly greater count rate for top right detector (DSSD#1) now that the beam energy has been lowered. ADC over range? Beam target overlap change?</p> <p>Plan to check optimisation of beam-target overlap and beam settings again.</p> <p>12:40</p> <p>Beam lost. Detectors out. R29_11</p> <p>13:37</p> <p>Electron cooler is not working again. We will have un-cooled beam again.</p> <p>Will start a new run 30 for un-cooled beam on target.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown