Run started 13:40
Target density 4.3e11, Beam injection is ~1e7, Pressure in the ring is ~1e-10 mbar.
Detectors have been moved IN with servo motors only (left arm pot = 36.5 mm, right arm pot =37.7 mm
Time between injections is 12 seconds. Beam is in the ring for 3 seconds of the cycle.
System wide checks OK
Temperatures OK
Leakage current plot attached -> temperature fluctuations (attachment 1)
ADC data items stats (attachment 2)
Merger and tape server OK
All histograms and statistics zero'd
14:17
Cave access required. No beam
15:24
No beam. System wide checks ok. Merger ok.
Attatchment 3: stats
Attatchment 4: Temperatures generally okay, 3 were red before reload, one red after reload.
Attatchment 5-8: Waveforms. Layout 7 and 8 look different from yesterday, consistnely different after several reloads.
Attatchment 9: Leakage current
Attatchment 10: LOWENERGYEXEY PLOTS
17:12
Tunning beam. System wide checks ok. Merger ok.
Attatchment 11: stats
Attatchment 12: Temperatures generally okay, 3 were red reloaed and stayed red but not so high.
Attatchment 13-16: Waveforms. Were the same as previous check.
Attatchment 17: Leakage current. They are tunning the beam so its a little bit changed.
19:28
Still hvae unstable noncooled beam, currently being worked on.
Tunning beam. System wide checks ok. Merger ok.
Attatchment 18: Temperatures generally okay, 3 were red reloaed and stayed red but not so high and were slighlty dicrease.
Attatchment 19-22: Waveforms. Were the same as previous check.
Attatchment 23: Leakage current. Slowly increasing from last check in, highest its been but conditions are not great at the moment.
21:10
We did not have any update about the beam. They still work on it.
Tunning beam. System wide checks ok. Merger ok. Stats were ok.
Attatchment 24: Temperatures generally okay, Same 3 were red and they increased a little bit. Nothing too concerning.
Attatchment 25-28: Waveforms. Were the same as previous check.
Attatchment 29: Leakage current. Contining to increase by small amount from last check.
|