AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Feb 16 10:02:41 2024
Author
*
:
Subject
*
:
<p>11:01</p> <p>Run 35 started cooled beam on target</p> <p>Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)</p> <p>Electron cooler voltage 751.4 this corresponds to 1.3436 MeV/u. This should be on the peak of the resonance.</p> <p>Target density is 3.75e11 at/cm2, ring pressure looks OK YR09 1.43e-10 mbar.</p> <p>Horizontal beam position is -7.5 mm, vertical beam position is 0.0 mm. Same as run 33.</p> <p>Beam is in the ring for 8 seconds and total cycle time between injections is 12 seconds. Same as run 33</p> <p>Beam injection looks stable. ~2e7 injected and no missed injections so far.</p> <p>Merger OK, Tape server OK</p> <p>Merger statistics zero'd</p> <p>All histograms and statistics zero'd, monitoring code reset.</p> <p>ADC data item statistics looks as before, very few counts until injection into the ring. OK</p> <p>FEE temperatures look OK</p> <p>System checks OK</p> <p>Leakage current trending upwards, same as previous elog.</p> <p>13:33</p> <p>FEE temperatures OK - all FEEs at least 1.5C below vertex warning</p> <p>ADC data items statistics OK</p> <p>Merger and Tape server OK</p> <p>Target density 3.8e11 at/cm2, ring pressure stable.</p> <p>Ring injections look very stable</p> <p>Leakage current now decreasing (attachment 1)</p> <p>Monitoring code xy and energy histograms (attachment 2+3)</p> <p>15:03</p> <p>System wide checks ok. Merger ok. Temperatures ok.</p> <p>Attatchment 4: Stats</p> <p>Attatchment 5: Temperatures</p> <p>Attatchments 6-9: Waveforms.</p> <p>Attatchment 10: Leakage current</p> <p>Attatchment 11: lowenergyEytotal plots</p> <p>17:09</p> <p>System wide check ok. Merger ok. Temperature ok.</p> <p>Attachment 12: Stats</p> <p>Attachment 13: Temperatures</p> <p>Attachment 14-18: Waveforms (Layout 7: strange behaviour in aida01, went to ASIC Control and did "Check ASIC control" three times, which resolved the problem)</p> <p>Attachment 19: Leakage current</p> <p>Attachment 20: lowenergyEytotal plots</p> <p>Gas pressure was going up a little bit: changed Y position of the nozzle from 1000 to 950.</p> <p>17:55</p> <p>The gas jet target pressure started to fall sharply at 17:34 and went down to zero within 2 minutes.</p> <p>It came back while it we were changing the nozzle position but at 17:49 fell to zero again.</p> <p>Currently waiting for Nikos to came and have look at it.</p> <p>18:10</p> <p>Target back in place and has a density of 4.04e11. Beam transformer looks similar to pre plummeting target density.</p> <p> </p> <p> </p> <p>18.55 Check ASIC load FEE64 aida16 asic#3 HEC channels active</p> <p> Following check load merger rate decreased significantly.</p> <p>19:14</p> <p>Gas density remains stable around 4e11 after the incident at 17:34 and the beam transformer singal looks ok too. Gas pressure ok.</p> <p>Merger: All aidas turn green but the merger has decreased significantly (too about 306 000 items/sec) as mentioned above.</p> <p>System wide check ok. Temperature ok.</p> <p>Attachment 21: Stats</p> <p>Attachment 22: Temperatures</p> <p>Attachment 23-26: Waveforms</p> <p>Attachment 27: Leakage current</p> <p> </p> <p> </p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_from_2024-02-16_13-44-25.png
Original size: 1920x977
Attachment 2:
Screenshot_from_2024-02-16_13-46-26.png
Original size: 1920x1014
Attachment 3:
Screenshot_from_2024-02-16_13-46-52.png
Original size: 1920x1014
Attachment 4:
Screenshot_from_2024-02-16_14-56-20.png
Original size: 3840x1080
Attachment 5:
Screenshot_from_2024-02-16_14-56-38.png
Original size: 3840x1080
Attachment 6:
Screenshot_from_2024-02-16_14-58-01.png
Original size: 3840x1080
Attachment 7:
Screenshot_from_2024-02-16_14-58-31.png
Original size: 3840x1080
Attachment 8:
Screenshot_from_2024-02-16_14-59-59.png
Original size: 3840x1080
Attachment 9:
Screenshot_from_2024-02-16_15-00-11.png
Original size: 3840x1080
Attachment 10:
Screenshot_from_2024-02-16_15-00-54.png
Original size: 3840x1080
Attachment 11:
Screenshot_from_2024-02-16_15-02-24.png
Original size: 3840x1080
Attachment 12:
Screenshot_from_2024-02-16_16-54-55.png
Original size: 3840x1080
Attachment 13:
Screenshot_from_2024-02-16_16-55-17.png
Original size: 3840x1080
Attachment 14:
Screenshot_from_2024-02-16_16-56-23.png
Original size: 3840x1080
Attachment 15:
Screenshot_from_2024-02-16_16-57-08.png
Original size: 3840x1080
Attachment 16:
Screenshot_from_2024-02-16_16-58-01.png
Original size: 3840x1080
Attachment 17:
Screenshot_from_2024-02-16_17-04-41.png
Original size: 3840x1080
Attachment 18:
Screenshot_from_2024-02-16_17-06-07.png
Original size: 3840x1080
Attachment 19:
Screenshot_from_2024-02-16_17-08-45.png
Original size: 3840x1080
Attachment 20:
Screenshot_from_2024-02-16_17-20-51.png
Original size: 3840x1080
Attachment 21:
Screenshot_from_2024-02-16_19-10-26.png
Original size: 3840x1080
Attachment 22:
Screenshot_from_2024-02-16_19-10-39.png
Original size: 3840x1080
Attachment 23:
Screenshot_from_2024-02-16_19-11-56.png
Original size: 3840x1080
Attachment 24:
Screenshot_from_2024-02-16_19-12-21.png
Original size: 3840x1080
Attachment 25:
Screenshot_from_2024-02-16_19-12-50.png
Original size: 3840x1080
Attachment 26:
Screenshot_from_2024-02-16_19-13-32.png
Original size: 3840x1080
Attachment 27:
Screenshot_from_2024-02-16_19-14-12.png
Original size: 3840x1080
Attachment 28:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898