| <p>11:01</p>
<p>Run 35 started cooled beam on target</p>
<p>Detectors IN (left arm pot =36.5 mm, right arm pot = 70.49 mm)</p>
<p>Electron cooler voltage 751.4 this corresponds to 1.3436 MeV/u. This should be on the peak of the resonance.</p>
<p>Target density is 3.75e11 at/cm2, ring pressure looks OK YR09 1.43e-10 mbar.</p>
<p>Horizontal beam position is -7.5 mm, vertical beam position is 0.0 mm. Same as run 33.</p>
<p>Beam is in the ring for 8 seconds and total cycle time between injections is 12 seconds. Same as run 33</p>
<p>Beam injection looks stable. ~2e7 injected and no missed injections so far.</p>
<p>Merger OK, Tape server OK</p>
<p>Merger statistics zero'd</p>
<p>All histograms and statistics zero'd, monitoring code reset.</p>
<p>ADC data item statistics looks as before, very few counts until injection into the ring. OK</p>
<p>FEE temperatures look OK</p>
<p>System checks OK</p>
<p>Leakage current trending upwards, same as previous elog.</p>
<p>13:33</p>
<p>FEE temperatures OK - all FEEs at least 1.5C below vertex warning</p>
<p>ADC data items statistics OK</p>
<p>Merger and Tape server OK</p>
<p>Target density 3.8e11 at/cm2, ring pressure stable.</p>
<p>Ring injections look very stable</p>
<p>Leakage current now decreasing (attachment 1)</p>
<p>Monitoring code xy and energy histograms (attachment 2+3)</p>
<p>15:03</p>
<p>System wide checks ok. Merger ok. Temperatures ok.</p>
<p>Attatchment 4: Stats</p>
<p>Attatchment 5: Temperatures</p>
<p>Attatchments 6-9: Waveforms.</p>
<p>Attatchment 10: Leakage current</p>
<p>Attatchment 11: lowenergyEytotal plots</p>
<p>17:09</p>
<p>System wide check ok. Merger ok. Temperature ok.</p>
<p>Attachment 12: Stats</p>
<p>Attachment 13: Temperatures</p>
<p>Attachment 14-18: Waveforms (Layout 7: strange behaviour in aida01, went to ASIC Control and did "Check ASIC control" three times, which resolved the problem)</p>
<p>Attachment 19: Leakage current</p>
<p>Attachment 20: lowenergyEytotal plots</p>
<p>Gas pressure was going up a little bit: changed Y position of the nozzle from 1000 to 950.</p>
<p>17:55</p>
<p>The gas jet target pressure started to fall sharply at 17:34 and went down to zero within 2 minutes.</p>
<p>It came back while it we were changing the nozzle position but at 17:49 fell to zero again.</p>
<p>Currently waiting for Nikos to came and have look at it.</p>
<p>18:10</p>
<p>Target back in place and has a density of 4.04e11. Beam transformer looks similar to pre plummeting target density.</p>
<p> </p>
<p> </p>
<p>18.55 Check ASIC load FEE64 aida16 asic#3 HEC channels active</p>
<p> Following check load merger rate decreased significantly.</p>
<p>19:14</p>
<p>Gas density remains stable around 4e11 after the incident at 17:34 and the beam transformer singal looks ok too. Gas pressure ok.</p>
<p>Merger: All aidas turn green but the merger has decreased significantly (too about 306 000 items/sec) as mentioned above.</p>
<p>System wide check ok. Temperature ok.</p>
<p>Attachment 21: Stats</p>
<p>Attachment 22: Temperatures</p>
<p>Attachment 23-26: Waveforms</p>
<p>Attachment 27: Leakage current</p>
<p> </p>
<p> </p>
<p> </p>
<p> </p> |