Wed Sep 1 17:14:16 2021
Author
*
:
Subject
*
:
Lifted CARME with Al support on the CRYRING. No issues during transportation. Drilled new holes in the Al feet to fit elephant feet. Unclear if the issue is with the model, the frame or the feet themselves. In any case this issue is sorted. CARME was designed to interface with the CRYRING via the cross section with pumps and sensors that we decided dismount. To replace this section a length of xhv tubing and a bellow will be employed. Prepared today, to be mounted tomorrow. Aligned CARME height with beam height. This posed issues due to difficulty to adjust bolts under the cross members used to support the motors. See previous log entry. Bolts under those cross members are now only finger tight. Unclear whether the CARME section will drop slightly if disconnected from main body. It's the section housing the moving Dssds. May be an issue for tightening it back. Will investigate. Gate valves and supports to be installed tomorrow morning.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20210901_162435.jpg
Original size: 4000x2250
Attachment 2:
20210901_173059.jpg
Original size: 4000x2250
Attachment 3:
20210901_174157.jpg
Original size: 4000x2250
Attachment 4:
20210901_134635.jpg
Original size: 4000x2250
Attachment 5:
20210901_173059.jpg
Original size: 4000x2250
Attachment 6:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown