AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Nov 8 15:40:21 2025
Author
*
:
Subject
*
:
> Lifted CARME with Al support on the > CRYRING. No issues during transportation. > > Drilled new holes in the Al feet to fit > elephant feet. Unclear if the issue is > with the model, the frame or the feet > themselves. In any case this issue is > sorted. > > CARME was designed to interface with the > CRYRING via the cross section with pumps > and sensors that we decided dismount. To > replace this section a length of xhv > tubing and a bellow will be employed. > Prepared today, to be mounted tomorrow. > > Aligned CARME height with beam height. > This posed issues due to difficulty to > adjust bolts under the cross members used > to support the motors. See previous log > entry. > > Bolts under those cross members are now > only finger tight. Unclear whether the > CARME section will drop slightly if > disconnected from main body. It's the > section housing the moving Dssds. May be > an issue for tightening it back. Will > investigate. > > Gate valves and supports to be installed > tomorrow morning.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.3-7933898