AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 06:33:42 2025
Author
*
:
Subject
*
:
<p>08:57 Doing morning check. Checked the leakage currents, all ok. Attachment 1</p> <p>Tempritures of, attchment 2</p> <p>System wide check, all correct.</p> <p>Statistics ok, aida 4 was a little high, carlo oked it attachment 3 and 4 (hist)</p> <p>Spectrum brozer, ok, attachment 5 and 6</p> <p>Waveforem atachment 7 and 8</p> <p>Checked merger, spinner spinning...</p> <p>Attached screenshot of merger 9</p> <p> </p> <p>11:15 Beam current is around 2.5E7 and the target dencity is 5.3E11 cm2, there was small isntability (dips) from the beam, reason unknown, all detectors stable.</p> <p>Check leakage current, is stable, attachment 1</p> <p>Tempreture ok, attachment 2</p> <p>System wide check, all pass</p> <p>Statistics checked, attachment 3, aida 4 is still high, histograms attachment 4</p> <p>Spectrum browser ok, attachment 5 and 6</p> <p>Waveforms attachment 7 and 8</p> <p>Checked merger, ok, spinner is spinning,</p> <p>Attachment 9 is the merger info</p> <p>12:21 Targer intencity started dropping quite dramatically. The beam position X value was adjusted to -11000, we got back above 4E11 /cm2</p> <p>13:08 Beam current is around 2.5E7 pretty stable, target is working, 61E11 /cm2, stable</p> <p>Checked leakage current, stable, attachment 1</p> <p>Temp. stable, atatchment 2</p> <p>System wide chack, all pass</p> <p>Statistics checked, attachemnt 3, aida 4 should be checked, histogram of rates 4 attached</p> <p>Spectrum browser, attached 5 and 6</p> <p>Waveform attached 7 and 8</p> <p>Merger ok, spinner is pinning,</p> <p>Attached 9 merger info</p> <p> </p> <p> </p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown