AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 5 12:12:13 2025
Author
*
:
Subject
*
:
FONT
Arial
Comic Sans MS
Courier New
Tahoma
Times New Roman
Verdana
SIZE
1
2
3
4
5
6
COLOR
blue
dark-blue
orange
red
dark red
green
dark-green
pink
purple
chocolate
22:54 We have moved the gas jet target out (y=4000), the density has dropped to zero. Started a new run (Run45) for background measurement. Informed HKR that the experiment will be monitored remotely without on-site personnel. They will check on the beam intensity. 02:08 System wide checks OK Temperatures OK Leakage current going up - OK Stats OK Merger continues OK Reset the online spectra (had not been done yet for this run). 20s rate looks fine, around 1000 counts/s on top left detector. Maybe we are hitting it with beam? But then we should be see a reduction in beam intensity, we do not. 04:00 System wide checks OK Temps OK Stats OK Merger OK 06:20 Beam intensity quite unstable, but HKR is correcting - attach 7 Systems wide checks OK Temps OK Merger OK Stats OK Some interesting features can be seen in the online histograms, e.g. no peak at 16 MeV and a clear straight line in the Ex vs x plot. 07:20 DAQ crashed due to multiple merger / tape server / HTTPD server instances being opened on workspace 5 Cannot soft reboot. FEEs off.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown