AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 534     Entry time: Tue Feb 20 08:41:08 2024
Author: OF, AG 
Subject: still no beam CRYRING 

We have mosty empty injections into CRYRING. Only sporadically the beam with good intensity is injected.

Michael Lestinsky is currently working on the problem.

ELOG V3.1.4-unknown